Mobile menu

Marquee Build in Fareham

Time lapse.You will see that in this video we start with a full suspended floor. This takes almost as much time to put in place as the frame and whites. Notice the cheeky way we grab a tea break sitting on the flatbed. The entire build is about 35 man hours.

When the structure is removed it usually takes about half the build time to pack away. After this basic structure was installed we laid new carpet ( You can see the red carpet in the photo above ), installed a Chinese hat entrance with debut doors, 70Kw of indirect heating and ran 63A power cables from our generator to the tent then distributed this throughout the marquee. The build was for PMN Wedding Fayres who have events across Hampshire.

❝ "¬ĚThe marquee looked great. Tim's advice on how to make the best of the space was invaluable. Tim's help on the day was above and beyond what we could have hoped for. It made a real difference to our day.' ¬† ❞
Simon & Christa "" Wimborne St Giles